From the abandoned well resumed production of natural gas

The Mubarek oil and gas production department from the No. 35th well of the North Mubarek gas condensate field was producing natural gas until 1995, after fulfilling its geological task, it was transferred to the stock of abandoned wells.

After the overhaul, specialists drilled the lateral wellbore to a depth of 2,202 meters, the press service of “Uzbekneftegaz” JSC said.

As a result of the work, an industrial influx was obtained with a preliminary flow rate of 100 thousand cubic meters of natural gas and 1.5 tons of gas condensate per day.

Currently, work is underway to equip the well and connect to the gas manifold.

22-02-2020 18:25